Thursday, June 28, 2012

Updated powerwashing and painting schedule

Island Gate Home Owners,

The below schedule is for the power washing/painting and deck staining project that is beginning at Island Gate this week. This project will take approximately 5 days for each section of buildings to be completed.  They will power wash the buildings first, let it dry, paint the doors and round window of each home and then stain the decks. Of course, weather permitting, the time it takes to complete each section could be altered.  As each section is completed we will send out an updated schedule.  The homes will be done in section order so everyone can gauge the progress and estimate the time that their unit will be worked on.


ADDRESSES
 DATE SCHEDULED
1-15 SEA BREEZE -ODD SIDE
WEEK OF JUNE 25 INTO WEEK OF JULY 2
76-92 WINDWARD-EVEN SIDE
WEEK OF JULY 9TH
56-72 WINDWARD-EVEN SIDE
 SECTION 3
1-15 BAY BREEZE-ODD SIDE
 SECTION 4
2-16 BAY BREEZE-EVEN SIDE
 SECTION 5
22-36 WINDWARD -EVEN SIDE
 SECTION 6
2-18 WINDWARD- EVEN SIDE
 SECTION 7
39-55 WINDWARD- ODD SIDE
 SECTION 8
73-83 WINDWARD- ODD SIDE
 SECTION 9
97-109 WINDWARD-ODD SIDE
 SECTION 10
115-131 WINDWARD- ODD SIDE
 SECTION 11
106-122 WINDWARD- EVEN SIDE
 SECTION 12
2-16 SEA BREEZE - EVEN SIDE
 SECTION 13


As a reminder:
In preparation for this effort Please take the following steps:
·     Remove all items from the deck, all items. The decks will be washed and the cleaning fluids may damage any items not removed.
·     DO NOT put deck items under the deck. The dripping chemicals will damage all items under the deck.
·     Remove all items that are currently under the deck, (see above for the reason why)
·     Close and lock all windows. The high pressure water and cleaning fluids blown into the house will do damage to the affected room.
·     If at all possible, please be available for the painter. Our front doors will be painted and having them opened will improve results.

If you are unable to complete these tasks or if you are unable to close your windows please notify Association Advisors ASAP. Taking these steps will result in the best results possible for your home and the look of our community. We will be notifying the next group of homes in the coming days.
As always please feel free to contact Association Advisors at 732-294-8882 or the board with any questions comments or concerns.


Deck pressure washing update

With the start of painting and pressure washing the decks will be pressure washed.  Pressure washing will NOT restore the wood to its original condition.  8 to 9 years of exposure, previous washings, sealing, staining etc. have taken their toll on the wood.  Pressure washing removes dirt, debris and some discoloration.  Our contractor has assured us he will be very careful when he does the pressure washing.  The board is exploring the color and type of product we will be using to seal the deck.  The board wants to balance attractiveness, durability and uniformity.  If you have any questions or comments about the product we will be using please share them now.   

Late night swim July 3rd

The pool will be opened until midnight on July 3rd in celebration of the holiday.  Please feel free to enjoy the pool right up to 12 am but remember please keep the noise down and be considerate of your neighbors

Enjoy

As a reminder

Fireworks are forbidden to be lit at Island Gate, July 4th or any day of the year.  thanks

4th of July Celebration and Fireworks Schedule

A check of the Stafford Township website indicated no fireworks planned on or around the 4th of July but there are plenty of other events in the area to celebrate the holiday.  Enjoy.  Source /www.co.ocean.nj.us/


2012 OCEAN COUNTY MUNICIPAL FIREWORKS CELEBRATIONS

BARNEGAT LIGHT
July 1
Parade @ 7 pm starting at 10th St., lines up at 6:30. Liberty band concert to follow at the bay dock area between 9th & 10th Street. In case of rain, concert will be in the Firehouse Social Hall on 10th and Central Boulevard. For further information contact 609-494-9196

BARNEGAT TOWNSHIP
July 4
Independence Day Celebration and Concert – 7:00 p.m. , Municipal Dock. Fireworks begin at Dusk.

BEACH HAVEN
July 4
Fireworks over the Bay, Taylor Avenue, Fireworks begin 9:00 p.m.

BEACHWOOD
July 4
6 p.m. Organization Fund Raiser – beach front, food and beverages. 8:45 p.m. (Dusk) Pyrotechnical Display Beachwood Beach Front – Bayside Ave.

BERKELEY
June 27
Concert - 6 p.m., Big Shot – Billy Joel Tribute Band
Veteran's Park. Fireworks to follow concert

BRICK TOWNSHIP
SUMMERFEST CONCERT (Windward Beach)
"Separate Ways, Ultimate Journey Show"
July 5th, 7 p.m.
Fireworks after show, approximately 9:00-9:30

HARVEY CEDARS
July 7th Craft Day by the Bay from 10am – 4pm @ Sunset Park

LACEY TWP.
July 3
Fireworks at Lacey Twp. High School, Dusk, Rain date July 5

LAKEHURST
July 4
Parade @ 11 a.m. starting at Union Avenue with a car show
Fireworks at dusk at Lake Horicon

LAKEWOOD
July 3
Fireworks display at dusk over Lake Carasaljo, streets clear 5 to 10:30 p.m.

LAVALLETTE
Sunday July 1at the Centennial Garden and Gazebo located on Bay Boulevard in Lavallette
Concert begins at 7p.m., fireworks at 9p.m.

MANCHESTER TOWNSHIP
June 30 at 5 p.m. with WOBM
Harry Wright Lake, Whiting, NJ
Fireworks Finale

MANTOLOKING
July 4th
Parade at starting noon on Downer Avenue.

OCEAN GATE
July 4
Parade beginning at 10 a.m. on Ocean Gate Avenue ending at Wildwood Ave, games and entertainment for children.

OCEAN TOWNSHIP
June 30
4th Annual Independence Celebration
Old Waretown Cemetery on Main St. at 9:30 a.m.

PINE BEACH
July 4
Parade and field games to celebrate Independence Day. The parade starts at 9 a.m. in front of the firehouse, Prospect Avenue and ends up at Vista Park.
Foot races, ladies balloon blowing, men's tug of war and sack races highlight the morning's activities.

PLUMSTED TOWNSHIP
June 30th
New Egypt High School, Gates open at 3 p.m.
Vendors, games and music. Concert with three acts. Fireworks begin at Dusk

POINT PLEASANT BEACH
July 4
Jenkinson's Beach. Fireworks begin at dusk

SEASIDE HEIGHTS
July 4
Firework display at 9:30 p.m. on the oceanfront, viewable from the boardwalk.

SEASIDE PARK
July 4
Bike Parade at 9:30 a.m. starting at the 5th Avenue pier and ending at the 14th Avenue pier.

TUCKERTON
July 4
Parade beginning at 10 a.m. starting at Route 9 ending at the Seaport. Further activities beginning at 4 p.m. including
Baby parade, children's activities. Music 1 p.m. to 8 p.m. Concludes with a fireworks display at Tip Seaman County Park at dusk

Thursday, June 21, 2012

Pool opening tomorrow !!!

The pool will be opening tomorrow June 22, from 9am to 9 pm.  Enjoy and try to stay cool during the heat wave !

Tuesday, June 19, 2012

Painting and Powerwashing starts at Island Gate this coming Monday June 25th

As previously mentioned, we are beginning the exterior cleaning and painting of our homes.  The exterior will be getting refreshed as the exterior of the homes will be getting power washed and all wood type materials will be getting painted, including doors and the round front window.


The first group of houses will be getting worked on starting this coming Monday June 25th, 2012.

The first group of homes will be 1 to 15 Seabreeze Court. 

In preparation for this effort Please take the following steps:

·         Remove all items from the deck, all items. The decks will be washed also and the cleaning fluids will damage all items not removed.
·         DO NOT put deck items under the deck since the dripping chemicals will damage all items under the deck also
·         Remove all items under the deck, (see above for the reason why)
·         Close and lock all windows.  The high pressure water and cleaning fluids blown into the house will do damage to the affected room.
·         If at all possible be available for the painter our front doors will be painted and having them opened will improve results.

If you are unable to complete these tasks or if you are unable to close your windows please notify AA ASAP.  Taking these steps will result in the best results possible for your home and the look of our community.  We will be notifying the next group of homes in the coming days. 


As always please feel free to contact AA 732-294-8882 or the board with any questions comments or concerns. 

Tuesday, June 12, 2012

Summer 2012 pool schedule

The pool schedule for the 2012 season is as follows.

Pool Hours open 9 am close 9 pm

Days the pool will be opened
May 19, 20
May 26, 27, 28
June 2, 3
June 9, 10
June 16, 17
Daily from June 23 to September 9
September 15, 16

Please follow the pool rules, be courteous to others and have a safe and enjoyable summer.

Monday, June 4, 2012

Pond on the Route 72 side of the property

The well that keeps the pond full on the Route 72 side of the property was shut off due to a leak that occured last week.  We are currently soliciting offers to repair the well.  You may notice some repair equipment on the property over the next week or so making reapirs to the well.  We will keep you informed of the status of the well and notify the community when repairs are made.  As always if you have any comments or questions please let us know.

Friday, June 1, 2012

Power washing and Painting coming to Island Gate

Over the summer the community’s exterior will be getting refreshed as the exterior of the homes will be getting power washed and all wood type materials will be getting painted.

This is a large project that will begin in June and take place over the next few months,  We ask for your patience in completing this project. 

We will let you know a week or so in advance before the work starts so you can take the following steps to make this effort successful. 

·         Remove all items from the deck, all items. The decks will be washed also and the cleaning fluids will damage all items not removed.
·         DO NOT put deck items under the deck since the dripping chemicals will damage all items under the deck also
·         Remove all items under the deck, (see above for the reason why)
·         Close and lock all windows.  The high pressure water and cleaning fluids blown into the house will do damage to the affected room.
·         If at all possible be available for the painter our front doors will be painted and having them opened will improve results.

This will be the first of many communications on this subject, we want to over communicate on this project to enable the best chances of success on the project. 
The board is very excited to be able to undertake this project, this is the biggest project in our existence and its intended to get Island Gate back in tip top shape.  We hope you are as excited as well.  As always please feel free to contact us with any questions comments or concerns.